Demolition of the north wing, ATHM#: 0000.1150.15, 1958

 Item — Box: 1, Folder: 2, item: 15
Scope and Contents

Image depicts the demolition of the north wing of the Wood Worsted Mill in Lawrence, MA, showing the gutted interior and partially remaining outside walls

Dates: 1958

Construction of the first section near the front of the building, ATHM#: 0000.1266.1, 1905-10-08

 Item — Box: 1, Folder: 1, item: 1
Scope and Contents

Image depicts large stone blocks in the foreground with a crane in the background; workmen visible in the left background; bridge over Merrimack River visible in the background

Dates: 1905-10-08

Construction view of open excavation area, ATHM#: 0000.1266.2, 1905-10-08

 Item — Box: 1, Folder: 1, item: 2
Scope and Contents

Image depicts a large open area where excavation has already taken place. The first section of the mill is to be built here. Workmen are visible in the background

Dates: 1905-10-08

Construction of the second section of building, ATHM#: 0000.1266.3, 1905-10-08

 Item — Box: 1, Folder: 1, item: 3
Scope and Contents

Image depicts a large open area where the second section of the building would be placed. Workmen are visible in the foreground; Merrimack River is visible in the background

Dates: 1905-10-08

Construction of the wood forms for concrete wall, ATHM#: 0000.1266.4, 1905-10-08

 Item — Box: 1, Folder: 1, item: 4
Scope and Contents

Image depicts the wood forms in the background for the concrete wall to be erected. Workman with a wheelbarrow in the foreground; other workmen are visible in the left background

Dates: 1905-10-08

Construction overview of excavated area, ATHM#: 0000.1266.5, 1905-10-08

 Item — Box: 1, Folder: 1, item: 5
Scope and Contents

Image depicts an overview of the excavated area for the mill construction. Burning brush pile in the right middle ground; Merrimack River is barely visible on the left

Dates: 1905-10-08

Construction of part of third section of building, ATHM#: 0000.1266.6, 1905-10-08

 Item — Box: 1, Folder: 1, item: 6
Scope and Contents

Image depicts a view of the area where the third section of the building would be built; the foundation has been partially dug out and wood forms for the retaining wall on left

Dates: 1905-10-08

Construction of the location of the power house, ATHM#: 0000.1266.7, 1905-10-08

 Item — Box: 1, Folder: 1, item: 7
Scope and Contents

Image depicts the area where the power house was to be built. Laborers have begun digging for a foundation; horses and wagons are visible

Dates: 1905-10-08

Construction overview of construction area, ATHM#: 0000.1266.8, 1905-10-08

 Item — Box: 1, Folder: 1, item: 8
Scope and Contents

Image depicts an overview of the construction area. Similar to box 1, folder 1, item 5

Dates: 1905-10-08

Construction of the concrete wall running length of area, ATHM#: 0000.1266.9, 1905-10-08

 Item — Box: 1, Folder: 1, item: 9
Scope and Contents

Image depicts a view of the concrete wall erected; it runs to within 40 feet of the little white house in the background; total length 1485 feet

Dates: 1905-10-08