Box 58
Container
Contains 31 Results:
Details, 9/14/1994
File — Box: 58
Identifier: AC-3
First and Second Floor Plan Sanitary Piping Layout, 9/14/1994
File — Box: 58
Identifier: P-1
First and Second Floor Plan Cold Water Piping Layout, 9/14/1994
File — Box: 58
Identifier: P-2
Enlarged Plans, Sanitary & C.W. Piping Isometric, Details and Notes, 9/14/1994
File — Box: 58
Identifier: P-3
First and Second Lighting Floor Plans, 9/14/1994
File — Box: 58
Identifier: E-1
First and Second Electrical Floor Plans, 9/14/1994
File — Box: 58
Identifier: E-2
Electrical One Line Diagram and Schedules, 9/14/1994
File — Box: 58
Identifier: E-3
Mero-Raumstruktur - Tertiary Subreflector Antenna Back-up Structure, 1/24/1996
File — Box: 58
Identifier: 95132
Dates:
1/24/1996
Site and Ground Floor Plan, 9/14/94
File — Box: 58
Identifier: C1
Horizontal Control Site Plan, 9/14/94
File — Box: 58
Identifier: C2